The purpose of this Project is; Excavation and filling, storm water system, underground piping and valves, manhole and catch basin work, sidewalks, drinking, RAW & fire water networks,fire fighting system, sanitary sewer system, irrigation system, CCTV, CCM & BMS system, telecommunication system, earth work, concreting, architectural work, thermal & moisture protection, conveying systems, pumps, Cooling tower, chillers plant, chilled water piping system network, LPG system & piping network, water distribution system network, drainage system network.

 

    About Yüksel

 
   
 
 
 
 
 
   King Faisal Ünivercity Hospital Phase1 Al Hassa Infrastructure Works / Saudi Arabia
 
 
 Client   Ministry of Higher             Education     
 Location  Saudi Arabia
 Contract Date   01. 06. 2010
 Completion Date   In Progress